Description
The fall-protection glazing protrudes from a groove in the ground. This is achieved by a special formwork profile, which needs to be mounted before concreting. The constructive “inner life” is introduced only after the removal of the formwork profile.
In the U series, the profile is removed from the concrete after the curing process. This procedure specifies a clear geometry for the glass assembly.